| Completed Projects |
| RAPID LOADING SYSTEMS INSTALLATION REFERENCE DETAIL |
| PRE WEIGH TRUCK LOADING SYSTEM - Make : Merit Technologies India Ltd |
| << Prev |
| TYPE OF LOADING SYSTEM |
MATERIAL |
LOADING RATE |
QTY |
CUSTOMER DETAIL |
ORDER DATE |
STATUS |
Pre-weigh Truck Loading System (Turn key basis) Including Civil,
75 Ton Surge bunker 30 Ton weigh hopper with complete Hydraulics and controls |
Coal |
600 TPH |
1 No. |
M/S. Singareni Collieries Co. Ltd., A.P (Manuguru Project) |
04.05.2005 |
13.07.2006 |
Pre-weigh Truck Loading System (Turn key basis) Including Civil,
75 Ton Surge bunker 30 Ton weigh hopper with complete Hydraulics and controls |
Coal |
600 TPH |
1 No. |
M/S. Singareni Collieries Co. Ltd., A.P (Khairagura Project) |
27.07.2005 |
30.11.2006 |
| Volumetric Pet coke Loading System |
Pet Coke |
1200 TPH |
9 No. |
M/S. Indian Oil Corporation
Ltd. Barauni, Bihar |
19.12.2002 |
Commissioned 15.06.2004 M/s MECON was the consultant |
|
| RAPID LOADING SYSTEM ANNUAL MAINTENANCE CONTRACT DETAIL - By Merit Technologies |
| TYPE OF LOADING SYSTEM |
MATERIAL |
LOADING RATE |
QTY |
INSTALLED AT |
ORDER DATE |
STATUS |
| Pre-weigh Wagon Loading System |
Coal |
2400-5500 TPH |
10 No. |
M/S Northern Coalfields Ltd., (Bina, Amlohri, Kakri, Khadia, Nighai, Dudhuchua & Jayant Project) |
Under contract for The last 9 Years |
We are responsible for almost
50 million ton coal dispatch |
| Pre-weigh Wagon Loading System |
Coal |
2400 TPH |
1 No. |
M/S. Mahanadi Coalfields Ltd., Orissa |
Under contract for the Last 6 Years |
|
| Pre-weigh Wagon Loading System |
Coal |
2400 TPH |
1 No. |
M/S. Singareni Collieries Co. Ltd., A.P
(Manuguru Project) |
Under contract for the Last 6 Years |
|
|
| << Prev |
|